Avanti Velodrome

Back to all projects

PROJECT OVERVIEW:

  • This project required over 520 tonnes of steel.  
     
  • The large trusses that run the width of the enclosed arena were particulary impressive and ran nearly the full length of the Jensen Steel fabrication shop. These huge trusses we fabricated and trial assembled at the Jensen Steel yard, before being broken apart and taken over to Cambridge in the middle of the night on the Truck and Jinka unit.

  • The project saw Jensen Steel win the Steel Excellence award in 2015 for projects over $3 million.