PROJECT OVERVIEW:

  • There is over 180 tonnes of structural steel in this project.

  • Included in this is the heavy custom fabricated steltech columns weighing 3 tonne each.

  • The structural design also called for alot of onsite welding at the main connection points between the columns and floor beams.